Case Studies

Industry

Sewage Pumping Station

Handrail & Grating Replacement

The Brief:

Hotchkiss Westwell were brought in to address a safety issue at a sewage pumping station where the existing handrail and floor grating had severely corroded over time.

The structure was no longer reliable, creating a clear risk of slipping and potential falls from height. The priority was to make the area safe again, with a solution built to last in such a harsh, corrosive setting.

“The priority was to make the area safe again, with a solution built to last in such a harsh, corrosive setting.”

The Solution:

Firstly, we carried out a full site survey and scanned it in 3D; this allowed us to capture accurate measurements quickly, reducing the amount of time spent working in a hazardous environment.

From this data, we prefabricated approximately 160 metres of new hand railing and 50m² of open mesh flooring, designed for long-term durability.

To ensure optimal safety during the works, we installed a temporary safety line. This allowed the existing corroded handrail and grating to be removed and replaced without putting operatives at risk.

All installation works were overseen by a dedicated working supervisor to maintain standards and keep the project running smoothly from start to finish.

Before:

After: