Winston Churchill Heritage Train Wheel Set Refurbishment

Case Studies Industry RAIL Winston Churchill Heritage Train Wheel Set Refurbishment The Brief: At Hotchkiss Westwell, we recently worked on an exciting heritage train project. The historic Winston Churchill train was in need of a wheel refurbishment, to both restore and maintain the standards required for operation. The wheel sets had naturally worn over regular […]

Brighton Lock Gate 72” Valve Refurbishment

Case Studies Industry Marine Brighton Lock Gate 72” valve Refurbishment The Brief: The gate system had developed multiple faults which prevented the seals from operating correctly. Misalignment within the assembly meant the bars were not sealing properly, leading to continued leakage. During inspection, it became clear that several previous repair methods and component choices were […]

Subsea Cable Frame Fabrication & Machining

Case Studies Industry Subsea Cable Subsea Cable Frame Fabrication & Machining Timeframe 2 weeks The Brief: A client in the subsea cable industry required large structural frames to support their operation. The frames needed to be manufactured from mild steel and machined with high accuracy on critical mounted faces to ensure correct alignment within the […]

Handrail & Grating Replacement at Sewage Pumping Station

Case Studies Industry Sewage Pumping Station Handrail & Grating Replacement The Brief: Hotchkiss Westwell were brought in to address a safety issue at a sewage pumping station where the existing handrail and floor grating had severely corroded over time. The structure was no longer reliable, creating a clear risk of slipping and potential falls from […]

Barge Post & Stag Horn Bollard Installation

Case Studies Industry Environment Agency Barge Post & Stag Horn Bollard Installation Timeframe Ongoing The Brief: The Environment Agency required the installation of barge posts and stag horn bollards across a number of sites throughout the South East. These components are essential for safe and secure mooring, so the installation needed to be built to […]

Porters Lock Radial Sluice Bearing Replacement

Case Studies Industry Environment Agency Porters Lock Radial Sluice Bearing Replacement Timeframe 6 Months The Brief: The Environment Agency required the bearings on a 28-tonne radial sluice gate at Porters Lock to be replaced as part of planned infrastructure maintenance. The work had to be carried out in situ, meaning the sluice could not be […]

CODED WELDERS

Case Studies Client Thorpe Park CODED WELDERS BESPOKE PROJECT Timeframe 6 weeks The Brief: Our trained coded welders were called upon to weld a flange onto a boom which was then attached via the flange onto the individual seat. The coded welding ensured that the project was completed with safety of paramount importance, especially reassuring […]