Case Studies

Client

OFFSHORE ENERGY SECTOR

CAROUSEL CABLE LAYING MACHINE

Timeframe

6 weeks

The Brief:

Hotchkiss Westwell were commissioned to design, manufacture and install a 35 metre wide main carousel production machine as part of this expansion.

Due to the size of the project it was completed in stages and also included the creation and installation of a cable tractor and cable-laying arm.

John D Hotchkiss Engineerings’ Director Tom Sisley

“was extremely pleased with how the project went,” adding that “they were able to discuss and implement a variety of changes in design making cost saving reductions in both machinery and the end package.”