The Brief:

The Environment Agency required the installation of barge posts and stag horn bollards across a number of sites throughout the South East. These components are essential for safe and secure mooring, so the installation needed to be built to withstand constant use in exposed conditions.

Given the environments involved, the fixings had to cope with heavy loads and long-term exposure to weather. Reliability was key; failure or movement in these fittings could lead to safety issues and costly downtime.

The Environment Agency supplied the barge posts and stag horn bollards themselves, and required a specialist contractor to supply the appropriate fixings and carry out the installation to a high standard across multiple locations.

“Care was taken at every stage to ensure accurate positioning and secure fixing, maintaining consistency across all locations.”

The Solution:

Hotchkiss Westwell supplied all required stainless steel fixings, including studs, washers, and dome nuts. Stainless steel was selected to ensure long-term durability and resistance to corrosion, particularly important in outdoor and waterside environments.

Our team carried out the full installation process, working across multiple sites as part of an ongoing programme. Each barge post and bollard was installed using Vinylester Injection Mortar, providing a strong and secure bond into the existing structure. This method ensures high load capacity and long-term reliability, even in demanding conditions.

Care was taken at every stage to ensure accurate positioning and secure fixing, maintaining consistency across all locations. The use of high-quality materials combined with proven installation methods has resulted in a dependable solution that meets the Environment Agency’s requirements.

The project remains ongoing, with installations continuing across the South East as part of a wider rollout.